Project Details:


Location: Chicago, IL
Contractor: Midwest Surface Prep
Equipment: EDCO CPM8 Scarifier with tungsten carbide (TCT) cutters
Scope: 25,000 sq ft warehouse floor preparation
 

Challenges:

  • Remove 3mm thick epoxy coating
  • Level uneven concrete (up to 5mm variation)
  • Complete project within 3-day window

Performance Highlights:
Extended Wear Life - Completed entire project with single set of cutters
Consistent Performance - Maintained uniform cutting depth throughout
Time Savings - Achieved 1,200 sq ft/hour production rate
Cost Efficiency - Reduced cutter replacement costs by 60%

 

Contractor Testimonial:
"These carbide cutters outlasted our expectations. We did the whole warehouse without changing cutters once - something we've never done before on a job this size."

  • Project Foreman, Midwest Surface Prep